Industrial Mechanical Workshop Malaga The client’s oily water separator was underperforming due to neglect, causing flow issues, odors, and non-compliance with wastewater…
Case Studies
A high-rise apartment complex south of the river called CPM with concerns about their potable water supply pressure. On inspection of the…
One of CPM’s valued customers in the Perth CBD had a problem with their potable water pressure system. The constant cycling (pumps…
CPM was on site this week for a valued client in Rockingham. The client advised that their water usage had doubled over…